☀️🇧🇷

Renewable Energy Equipment: Pay Brazil Suppliers Fast

Import solar panels, wind turbines, batteries, and green energy infrastructure Send BRL payments to Brazil suppliers with t+0 (2.3s avg within unicorn network). Save 86% vs traditional banks.

Save £3,030 per £100k Payment

Typical savings for Renewable Energy Equipment paying Brazil suppliers

Traditional Bank
£3,535
FX Spread: 3.5% + £35 fee
  • ❌ 2-3 day settlement
  • ❌ Hidden FX margins
  • ❌ High correspondent bank fees
  • ❌ Manual compliance checks
Unicorn Currencies
£505
FX Spread: 0.5% + £5 fee
  • T+0 (2.3s avg within Unicorn network)
  • ✓ Transparent pricing
  • PIX available
  • ✓ 0.14s automated compliance
Your Annual Savings
86%
£3,030 per £100k

At £500k-£10M monthly volume, save £36,360/year

Common Challenges: Renewable Energy Equipment in Brazil

Industry Pain Points

  • Large project-based payments
  • Technology obsolescence risk
  • Government subsidy dependencies
  • Long installation timelines

Country-Specific Considerations

  • Central Bank of Brazil (Banco Central) regulations
  • Brazilian tax ID (CNPJ) required for business payments
  • Currency controls apply to BRL flows
  • Import license may be required for certain goods

How Unicorn Solves Renewable Energy Equipment Payment Challenges in Brazil

Fast Settlement: T+0 (2.3s avg within Unicorn network)

Use PIX for instant BRL settlement.Brazil's revolutionary instant payment system, launched 2020, now dominant

Real-Time FX Exposure Tracking

Upload supplier invoices as PDFs. Our AI OCR extracts amounts and currencies. See exactly what waiting costs you in real-time. Lock rates for 15 seconds when you see a good rate.

0.14s Compliance Screening

Automated compliance checks for Brazil regulations.Central Bank of Brazil (Banco Central) regulations handled automatically.

Renewable Energy Equipment Payment Profile

Understanding the payment dynamics of Renewable Energy Equipment when paying Brazil suppliers

Payment Timing

Milestone-based: 30% deposit, 40% on manufacture, 30% on delivery. Project cycles 3-12 months.

Settlement Priority: MODERATE: Project-planned payments. Subsidy deadline timing can create urgency for commissioning payments.

📄 Invoice Terms

30/40/30 milestone structure. LC for orders over £500k. Retention (5%) for warranty period.

Cash Flow Pattern:

Project-based and lumpy. Subsidy cycles drive deadlines. Installation season (spring/summer). Q1/Q4 budget cycles.

📊 FX Risk Profile

HIGH: CNY (70% of solar), EUR (wind), JPY/KRW (batteries). Project timelines 3-12 months create exposure windows.

Supplier Relationships:

Tier 1 manufacturer relationships for volume pricing. European for premium. Long-term for warranty support. Price-sensitive market.

Common Documentation for Renewable Energy Equipment

  • MCS Certificate
  • IEC Test Reports
  • CE/UKCA Declaration
  • Warranty Certificate
  • Performance Guarantee

Popular Brazil Supplier Types for Renewable Energy Equipment

Common Brazil Suppliers

  • Coffee exporters (Minas Gerais, São Paulo)
  • Agricultural commodities (Mato Grosso, Paraná)
  • Leather goods (Rio Grande do Sul)
  • Manufacturing (São Paulo, Rio de Janeiro)

Payment Tips for Brazil

  • PIX revolutionized Brazilian payments - instant, 24/7, free
  • Brazil = World's largest coffee exporter
  • BRL volatility high - use rate locks
  • Most suppliers now prefer PIX over TED/DOC
Typical Transaction Size
£75k-£300k
Compliance Notice: Subject to sanctions and compliance screening. Certain industries and countries not supported.

Ready to Pay Brazil Suppliers 86% Cheaper?

Join Renewable Energy Equipment businesses saving £3,030 per £100k payment with t+0 (2.3s avg within unicorn network).

Bank of Canada registered PSP | FINTRAC licensed MSB