☀️🇨🇴

Renewable Energy Equipment: Pay Colombia Suppliers Fast

Import solar panels, wind turbines, batteries, and green energy infrastructure Send COP payments to Colombia suppliers with t+0 (2.3s avg within unicorn network). Save 83% vs traditional banks.

Save £2,419 per £100k Payment

Typical savings for Renewable Energy Equipment paying Colombia suppliers

Traditional Bank
£2,924
FX Spread: 2.9% + £24 fee
  • ❌ 2-3 day settlement
  • ❌ Hidden FX margins
  • ❌ High correspondent bank fees
  • ❌ Manual compliance checks
Unicorn Currencies
£505
FX Spread: 0.5% + £5 fee
  • T+0 (2.3s avg within Unicorn network)
  • ✓ Transparent pricing
  • PSE (Pagos Seguros en Línea) available
  • ✓ 0.14s automated compliance
Your Annual Savings
83%
£2,419 per £100k

At £500k-£10M monthly volume, save £29,028/year

Common Challenges: Renewable Energy Equipment in Colombia

Industry Pain Points

  • Large project-based payments
  • Technology obsolescence risk
  • Government subsidy dependencies
  • Long installation timelines

Country-Specific Considerations

  • Banco de la República de Colombia regulations
  • DIAN (Tax Authority) documentation
  • IVA (VAT 19%) on goods and services
  • Customs declaration requirements

How Unicorn Solves Renewable Energy Equipment Payment Challenges in Colombia

Fast Settlement: T+0 (2.3s avg within Unicorn network)

Use PSE (Pagos Seguros en Línea) for instant COP settlement.Colombia instant online payment system

Real-Time FX Exposure Tracking

Upload supplier invoices as PDFs. Our AI OCR extracts amounts and currencies. See exactly what waiting costs you in real-time. Lock rates for 15 seconds when you see a good rate.

0.14s Compliance Screening

Automated compliance checks for Colombia regulations.Banco de la República de Colombia regulations handled automatically.

Renewable Energy Equipment Payment Profile

Understanding the payment dynamics of Renewable Energy Equipment when paying Colombia suppliers

Payment Timing

Milestone-based: 30% deposit, 40% on manufacture, 30% on delivery. Project cycles 3-12 months.

Settlement Priority: MODERATE: Project-planned payments. Subsidy deadline timing can create urgency for commissioning payments.

📄 Invoice Terms

30/40/30 milestone structure. LC for orders over £500k. Retention (5%) for warranty period.

Cash Flow Pattern:

Project-based and lumpy. Subsidy cycles drive deadlines. Installation season (spring/summer). Q1/Q4 budget cycles.

📊 FX Risk Profile

HIGH: CNY (70% of solar), EUR (wind), JPY/KRW (batteries). Project timelines 3-12 months create exposure windows.

Supplier Relationships:

Tier 1 manufacturer relationships for volume pricing. European for premium. Long-term for warranty support. Price-sensitive market.

Common Documentation for Renewable Energy Equipment

  • MCS Certificate
  • IEC Test Reports
  • CE/UKCA Declaration
  • Warranty Certificate
  • Performance Guarantee

Popular Colombia Supplier Types for Renewable Energy Equipment

Common Colombia Suppliers

  • Coffee exporters (Eje Cafetero region)
  • Flower growers (Bogotá savanna)
  • Textile factories (Medellín, Bogotá)
  • Emerald traders (Bogotá)

Payment Tips for Colombia

  • Colombia = Coffee leader (3rd globally), flower exporter (2nd globally)
  • PSE widely adopted for COP payments
  • Bogotá + Medellín + Cali = Main business centers
  • Improving security situation - verify supplier locations
Typical Transaction Size
£30k-£145k
Compliance Notice: Subject to sanctions and compliance screening. Certain industries and countries not supported.

Ready to Pay Colombia Suppliers 83% Cheaper?

Join Renewable Energy Equipment businesses saving £2,419 per £100k payment with t+0 (2.3s avg within unicorn network).

Bank of Canada registered PSP | FINTRAC licensed MSB