☀️🇻🇳

Renewable Energy Equipment: Pay Vietnam Suppliers Fast

Import solar panels, wind turbines, batteries, and green energy infrastructure Send VND payments to Vietnam suppliers with t+0 (2.3s avg within unicorn network). Save 86% vs traditional banks.

Save £3,030 per £100k Payment

Typical savings for Renewable Energy Equipment paying Vietnam suppliers

Traditional Bank
£3,535
FX Spread: 3.5% + £35 fee
  • ❌ 2-3 day settlement
  • ❌ Hidden FX margins
  • ❌ High correspondent bank fees
  • ❌ Manual compliance checks
Unicorn Currencies
£505
FX Spread: 0.5% + £5 fee
  • T+0 (2.3s avg within Unicorn network)
  • ✓ Transparent pricing
  • NAPAS (National Payment Corporation of Vietnam) available
  • ✓ 0.14s automated compliance
Your Annual Savings
86%
£3,030 per £100k

At £500k-£10M monthly volume, save £36,360/year

Common Challenges: Renewable Energy Equipment in Vietnam

Industry Pain Points

  • Large project-based payments
  • Technology obsolescence risk
  • Government subsidy dependencies
  • Long installation timelines

Country-Specific Considerations

  • State Bank of Vietnam (SBV) foreign exchange controls
  • Tax identification number (TIN) required for suppliers
  • Import license for certain goods
  • VND is non-convertible - must use USD intermediary

How Unicorn Solves Renewable Energy Equipment Payment Challenges in Vietnam

Fast Settlement: T+0 (2.3s avg within Unicorn network)

Use NAPAS (National Payment Corporation of Vietnam) for instant VND settlement.Vietnam domestic payment switch

Real-Time FX Exposure Tracking

Upload supplier invoices as PDFs. Our AI OCR extracts amounts and currencies. See exactly what waiting costs you in real-time. Lock rates for 15 seconds when you see a good rate.

0.14s Compliance Screening

Automated compliance checks for Vietnam regulations.State Bank of Vietnam (SBV) foreign exchange controls handled automatically.

Renewable Energy Equipment Payment Profile

Understanding the payment dynamics of Renewable Energy Equipment when paying Vietnam suppliers

Payment Timing

Milestone-based: 30% deposit, 40% on manufacture, 30% on delivery. Project cycles 3-12 months.

Settlement Priority: MODERATE: Project-planned payments. Subsidy deadline timing can create urgency for commissioning payments.

📄 Invoice Terms

30/40/30 milestone structure. LC for orders over £500k. Retention (5%) for warranty period.

Cash Flow Pattern:

Project-based and lumpy. Subsidy cycles drive deadlines. Installation season (spring/summer). Q1/Q4 budget cycles.

📊 FX Risk Profile

HIGH: CNY (70% of solar), EUR (wind), JPY/KRW (batteries). Project timelines 3-12 months create exposure windows.

Supplier Relationships:

Tier 1 manufacturer relationships for volume pricing. European for premium. Long-term for warranty support. Price-sensitive market.

Common Documentation for Renewable Energy Equipment

  • MCS Certificate
  • IEC Test Reports
  • CE/UKCA Declaration
  • Warranty Certificate
  • Performance Guarantee

Popular Vietnam Supplier Types for Renewable Energy Equipment

Common Vietnam Suppliers

  • Textile manufacturers (Ho Chi Minh City, Hanoi)
  • Electronics assembly (Bac Ninh, Hai Phong)
  • Furniture makers (Binh Duong)
  • Agricultural exporters (Mekong Delta)

Payment Tips for Vietnam

  • Most Vietnamese suppliers prefer USD over VND
  • SWIFT still dominant - local rails underdeveloped
  • Vietnam emerging as China alternative for manufacturing
  • Lower labor costs but less infrastructure than China
Typical Transaction Size
£40k-£150k
Compliance Notice: Subject to sanctions and compliance screening. Certain industries and countries not supported.

Ready to Pay Vietnam Suppliers 86% Cheaper?

Join Renewable Energy Equipment businesses saving £3,030 per £100k payment with t+0 (2.3s avg within unicorn network).

Bank of Canada registered PSP | FINTRAC licensed MSB